Scio Church Rd

Location of roadwork:
Scio Church Rd between Zeeb Rd and Wagner Rd

Township:
Lodi, Scio

When is the work being done:
2024

Description of work:
Mill & Resurfacing

Impact on Traffic:
Lane Restrictions and Flagging Operation

Funding Source(s):
Four-Year Road and Non-Motorized Path Millage, Michigan Transportation Fund (MTF)

Latest Updates

December 11, 2024 Scio Church Rd Resurfacing (Lodi Twp and Scio Twp) – Final Project Update

Thank you for subscribing to receive email updates about the Scio Church Rd Resurfacing in Lodi Township and Scio Township. We opened the road on August 28, 2024 and finished adding aggregate (stone) shoulders and permanent pavement markings during the week of September 9, 2024.

We are always seeking ways to improve our communications and we need your feedback. Please complete this short survey and let us know how we did communicating about this project. Click here for the survey.

Thank you again for subscribing!

P.S. This will be the last email update about this project. If you would like to subscribe to receive other road advisories from us, for example, road closure alerts for [TOWNSHIP NAME], click here to update your email preferences.

September 17, 2024 Project Update #3: Scio Church Rd (Lodi and Scio Twps.)

The week of September 9th, the contractor for the Washtenaw County Road Commission (WCRC) finished placing aggregate (stone) shoulders and permanent pavement markings on Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi and Scio Townships.

Have questions about this project contact Mike Bernbeck, Project Manager – Design & Construction, at (734) 327-6654, or via email at [email protected].

Pictured above are new shoulders and pavement markings on Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi and Scio Townships

September 7, 2024 Lane Restrictions: Scio Church Rd (Lodi and Scio Twps.)

WHEN: Monday, September 9, 2024

WHERE: Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi and Scio Townships

WHY: Road resurfacing

BACKGROUND: On Monday, September 9, 2024, the Washtenaw County Road Commission (WCRC) is extending lane restrictions on Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi and Scio Townships for a road resurfacing project.

The road improvements are expected to take approximately an additional week. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Mike Bernbeck, Project Manager – Design & Construction, (734) 327-6654, or via email at [email protected]

ISSUE DATE: 09/07/24

August 28, 2024 Project Update #2: Scio Church Rd Resurfacing Project

Great news, the contractor just completed the paving operation on Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi and Scio Townships. Aggregate (stone) shoulders and permanent pavement markings have been scheduled the week of September 2. For the remaining portion of the work, traffic will be maintained using a flagging operation.  

 WCRC will send out updates as the project progresses. Have questions? Contact Mike Bernbeck, Project Manager – Design & Construction, at (734) 327-6654, or via email at [email protected]. 

Pictured above is the paving operation on Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi and Scio Townships.
August 21, 2024 Project Update #1: Scio Church Rd Resurfacing (Lodi and Scio Twps.)

Our resurfacing project on Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi and Scio Townships is underway! 

On Wednesday, August 21, 2024, the contractor for Washtenaw County Road Commission (WCRC) imposed a daytime lane restriction on Scio Church Rd to begin milling the existing road surface. Two-way traffic is being maintained during the milling. 

 The contractor expects to perform asphalt paving on August 22 thru August 24, weather permitting. During the paving operation, westbound traffic only will be maintained in one lane from Wagner Rd to Zeeb Rd. Eastbound traffic will be directed to use the posted detour route. Once paving is completed, the next step will be adding aggregate (stone) shoulders and pavement markings.

WCRC will send out updates as the project progresses. Have questions? Contact Mike Bernbeck, Project Manager – Design & Construction, at (734) 327-6654, or via email at [email protected]. 

Pictured above is the milling operation on Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi and Scio Townships.
August 14, 2024 Revised Road Closure with Detour: Scio Church Rd (Lodi and Scio Twps)

WHEN: Monday, August 19, 2024

WHERE: Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi and Scio Townships

WHY: Road resurfacing

BACKGROUND: On Monday, August 19, 2024, the Washtenaw County Road Commission (WCRC) will begin a road resurfacing project on Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi and Scio Township.

Motorists can expect daily lane closures for eastbound traffic on Scio Church Rd. WCRC will maintain westbound traffic. During the paving operation, eastbound traffic will be directed to use the detour route, access will be maintained from Wagner Rd within the closure limits.

The road improvements are expected to take approximately one week. However, all dates are tentative and subject to change due to weather conditions.

DETOUR: Click here for the detour map.

CONTACT: If you have any questions concerning this work, please contact Mike Bernbeck, Project Manager – Design & Construction, (734) 327-6654, or via email at [email protected]

ISSUE DATE: 08/14/24

August 13, 2024 Road Closure with Detour: Scio Church Rd (Lodi and Scio Twps)

WHEN: Monday, August 19, 2024

WHERE: Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi and Scio Townships

WHY: Road resurfacing

BACKGROUND: On Monday, August 19, 2024, the Washtenaw County Road Commission (WCRC) will close Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi and Scio Townships to begin a road resurfacing project.

The road improvements are expected to take approximately one week. However, all dates are tentative and subject to change due to weather conditions.

Access will be maintained for any residents who work or live within the closure limits.

 DETOUR: Click here for the detour map.

CONTACT: If you have any questions concerning this work, please contact Mike Bernbeck, Project Manager – Design & Construction, (734) 327-6654, or via email at [email protected].

ISSUE DATE: 08/13/24

August 1, 2024 Lane Restrictions: Scio Church Rd (Lodi & Scio Twps)

WHEN: Thursday, August 1, 2024

WHERE: Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi and Scio Townships

WHY: Drainage work

BACKGROUND: On Thursday, August 1, 2024, the Washtenaw County Road Commission (WCRC) will continue drainage work on Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi and Scio Townships.

The road will not be closed to traffic, but delays are likely due to lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The drainage work is expected to take approximately one day. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 08/01/24

July 30, 2024 Lane Restrictions: Scio Church Rd (Lodi & Scio Twps)

WHEN: Wednesday, July 31, 2024

WHERE: Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi and Scio Townships

WHY: Drainage work

BACKGROUND: On Wednesday, July 31, 2024, the Washtenaw County Road Commission (WCRC) will begin drainage work Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi and Scio Townships.

The road will not be closed to traffic, but delays are likely due to lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The drainage work is expected to take approximately one day. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Ken Harris, Superintendent of Maintenance, (734) 327-6696, or via email at [email protected]

ISSUE DATE: 07/30/24

April 11, 2024 Daytime Lane Closure: Scio Church Rd (Lodi & Scio Twps)

WHEN: Monday, April 15, 2024

WHERE: Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi & Scio Townships

WHY: Forestry

BACKGROUND: On Monday, April 15, 2024, the Washtenaw County Road Commission (WCRC) will close a lane on Scio Church Rd between Zeeb Rd and Wagner Rd in Lodi & Scio Townships during daytime hours to perform forestry work.

The forestry work is expected to take approximately five days. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact Jared Powers, Assistant Superintendent of Maintenance, (734) 327-6650, or via email at [email protected]

ISSUE DATE: 04/11/24

March 19, 2024 Virtual Public Meeting: 2024 Resurfacing Program (County-wide)

PROJECT: 2024 County-wide Resurfacing Program

WHEN: Thursday, April 4, 2024, at 11 a.m.

WHERE: Online: https://bit.ly/wcrcprojectmeeting

By Touchtone Phone: (929) 205-6099, Meeting ID: 879 2332 8754

WHY: The Washtenaw County Road Commission (WCRC) will hold a virtual project information meeting regarding the planned County-wide Resurfacing Program taking place during the 2024 construction season.

During construction, traffic will be maintained under lane restrictions and flagging operations. During specific construction activities, the road may be closed, and a detour will be posted. WCRC estimates it will take approximately two/three weeks, on average, to complete each project, weather pending.

The virtual public meeting will be held via Zoom Thursday, April 4, 2024, at 11 a.m. There will be a brief presentation followed by time for questions from the audience. A recording of the meeting will be posted to the project web page after the meeting.

Click here to learn more about joining the virtual meeting.

CONTACT: If you have any questions concerning this project, please contact Mike Bernbeck, Project Manager, at (734) 327-6654, or via email at [email protected].

WCRC will provide necessary reasonable auxiliary aids and services, such as signers for the hearing impaired and audiotapes or printed material being presented at the meeting, to individuals with disabilities upon a 5-business day notice. Individuals with disabilities requiring auxiliary aids or services should contact Tiffany Oliphant, communications manager, by phone (734) 327-6646 or by email [email protected].

ISSUE DATE: 03/19/24

March 15, 2024 Project Announcement: 2024 Resurfacing Program (County-wide)

The Washtenaw County Road Commission (WCRC) is announcing plans to invest $6.7 million to improve approximately 20 lane miles of pavement throughout Washtenaw County during the 2024 construction season. Cadillac Asphalt was awarded the contract. The projects are funded through the 2021-2024 Four-year County-wide Roads and Non-Motorized Millage, federal funds and Michigan Transportation Funds (MTF).

“Most of these investments are made possible by Washtenaw County residents who travel on these roads every day. As stewards of these precious dollars, WCRC is committed to ensuring these resources are reinvested into communities, in which it came from,” said Mike Bernbeck, WCRC Project Manager.

Construction will begin mid-April and will end during the fall of 2024, weather pending. Listed below are the project locations with a link to their project web page, funding cost and traffic impacts:

Motorists will experience road closures with detours, lane restrictions, and flagging operations. WCRC will maintain access for residents who live or work within the project limits during construction.

WCRC will host a virtual public information meeting regarding the County-wide Resurfacing projects in Spring 2024. WCRC will post project updates online at wcroads.org. Residents can subscribe to road work advisories and project updates here.

For specific questions on this project, contact Mike Bernbeck, Project Manager, (734) 327-6654 or [email protected].

Pictured is a map of our 2024 County-wide Resurfacing Program.

Contact information:
Felix Weber-Bailey
    • (734) 327-6689
Receive Updates on the Project
Subscribe to Project Updates